Sociotechnical systems approach to BIM implementation in a multidisciplinary construction context E Sackey, M Tuuli, A Dainty Journal of management in engineering 31 (1), A4014005, 2015 | 175 | 2015 |
Earning identity and respect through work: A study of children involved in fishing and farming practices in Cape Coast, Ghana ET Sackey, BO Johannesen Childhood 22 (4), 447-459, 2015 | 26 | 2015 |
BIM implementation: from capability maturity models to implementation strategy E Sackey, M Tuuli, A Dainty Sustainable Building Conference, 196-207, 2013 | 20 | 2013 |
A sociotechnical systems analysis of building information modelling (STSaBIM) implementation in construction organisations E Sackey Loughborough University, 2014 | 14 | 2014 |
Spanning the multilevel boundaries of construction organisations: Towards the delivery of BIM-compliant projects E Sackey, J Akotia Construction Innovation 17 (3), 273-293, 2017 | 11 | 2017 |
Towards the delivery of sustainable regeneration projects’ types in the UK: an exploration of the role and level of involvement of key practitioners J Akotia, E Sackey International Journal of Construction Management 18 (5), 375-384, 2018 | 8 | 2018 |
Understanding socio-economic sustainability drivers of sustainable regeneration: an empirical study of regeneration practitioners in UK J Akotia, E Sackey European Planning Studies 26 (10), 2078-2098, 2018 | 6 | 2018 |
The role of built environment practitioners in driving the socio-economic sustainability aspects of sustainable regeneration J Akotia, E Manu, A Opoku, E Sackey Construction Economics and Building 20 (2), 89-108, 2020 | 5 | 2020 |
Expansive learning in contemporary construction organisations: An exemplar in BIM-mediated projects E Sackey, M Tuuli, A Dainty Built Environment Project and Asset Management 9 (3), 383-398, 2019 | 5 | 2019 |
A spatiotemporal perspective on empowerment in projects E Sackey, MM Tuuli, A Dainty Management and Innovation for a Sustainable Built Environment MISBE, 20-23, 2011 | 4 | 2011 |
Children Balancing Work with School: A Sociocultural Conception of Child Work and Schooling in Cape Coast Metropolitan Area, Ghana ET Sackey Norges teknisk-naturvitenskapelige universitet, Fakultet for …, 2013 | 3 | 2013 |
Dynamics of empowerment in projects E Sackey, MM Tuuli, A Dainty WEST AFRICA BUILT ENVIRONMENT RESEARCH (WABER) CONFERENCE 19-21 July 2011 …, 2011 | 3 | 2011 |
SOCIOTECHNICAL ALIGNMENT AND INNOVATION IN CONSTRUCTION: THE CASE OF BIM IMPLEMENTATION IN A HETEROGENEOUS CONTEXT E Sackey, M Tuuli, A Dainty BIM Management and Interoperability, 0 | 1 | |
Infrastructure Project Selection and Prioritisation for Socio-Economic Development in Mining Communities of Ghana: A Sequential Mixed Methods Research Approach E Sackey, J Akotia, JA Ottou Mixed Methods Research Design for the Built Environment, 172-184, 2023 | | 2023 |
Exploring the Deployment of Building Information Modelling (BIM) for Construction Products Management E Sackey, DAM Kwadzo Integrated Building Information Modelling, 181, 2017 | | 2017 |
Understanding Technology-Enhanced Construction Project Delivery: perspective from expansive learning and adaptive expertise E Sackey, DAM Kwadzo Journal of Construction Engineering and Project Management 7 (3), 26-38, 2017 | | 2017 |
A spatiotemporal perspective on empowerment E Sackey, M Tuuli, ARJ Dainty Loughborough University, 2011 | | 2011 |