Следене
Mohammad Nahangi, PhD, PEng
Mohammad Nahangi, PhD, PEng
Principal AI Scientist
Потвърден имейл адрес: uwaterloo.ca - Начална страница
Заглавие
Позовавания
Позовавания
Година
State of research in automatic as-built modelling
V Pătrăucean, I Armeni, M Nahangi, J Yeung, I Brilakis, C Haas
Advanced Engineering Informatics 29 (2), 162-171, 2015
3792015
Managing risk in modular construction using dimensional and geometric tolerance strategies
Y Shahtaheri, C Rausch, J West, C Haas, M Nahangi
Automation in construction 83, 303-315, 2017
1292017
Automated 3D compliance checking in pipe spool fabrication
M Nahangi, CT Haas
Advanced Engineering Informatics 28 (4), 360-369, 2014
1072014
6D DBSCAN-based segmentation of building point clouds for planar object classification
T Czerniawski, B Sankaran, M Nahangi, C Haas, F Leite
Automation in Construction 88, 44-58, 2018
1062018
Pipe spool recognition in cluttered point clouds using a curvature-based shape descriptor
T Czerniawski, M Nahangi, C Haas, S Walbridge
Automation in Construction 71, 346-358, 2016
952016
Monte Carlo simulation for tolerance analysis in prefabrication and offsite construction
C Rausch, M Nahangi, C Haas, W Liang
Automation in Construction 103, 300-314, 2019
742019
Identifying poses of safe and productive masons using machine learning
A Alwasel, A Sabet, M Nahangi, CT Haas, E Abdel-Rahman
Automation in Construction 84, 345-355, 2017
622017
Optimum assembly planning for modular construction components
C Rausch, M Nahangi, M Perreault, CT Haas, J West
Journal of computing in civil engineering 31 (1), 04016039, 2017
602017
Automated model‐based finding of 3D objects in cluttered construction point cloud models
MM Sharif, M Nahangi, C Haas, J West
Computer‐Aided Civil and Infrastructure Engineering 32 (11), 893-908, 2017
532017
Automating measurement process to improve quality management for piping fabrication
M Safa, A Shahi, M Nahangi, C Haas, H Noori
Structures 3, 71-80, 2015
522015
Automated assembly discrepancy feedback using 3D imaging and forward kinematics
M Nahangi, J Yeung, CT Haas, S Walbridge, J West
Automation in Construction 56, 36-46, 2015
482015
Skeleton-based discrepancy feedback for automated realignment of industrial assemblies
M Nahangi, CT Haas
Automation in construction 61, 147-161, 2016
462016
Safety-based efficiency evaluation of construction sites using data envelopment analysis (DEA)
M Nahangi, Y Chen, B McCabe
Safety science 113, 382-388, 2019
432019
Kinematics chain based dimensional variation analysis of construction assemblies using building information models and 3D point clouds
C Rausch, M Nahangi, C Haas, J West
Automation in Construction 75, 33-44, 2017
422017
Automated Localization of UAVs in GPS-Denied Indoor Construction Environments Using Fiducial Markers
M Nahangi, A Heins, A Schoellig, B McCabe
International Symposium on Automation and Robotics in Construction, 2018
372018
Automated Removal of Planar Clutter from 3D Point Clouds for Improving Industrial Object Recognition
T Czerniawski, M Nahangi, S Walbridge, C Haas
International Symposium on Automation and Robotics in Construction, 2016
342016
Improved tag-based indoor localization of UAVs using extended Kalman filter
N Kayhani, A Heins, W Zhao, M Nahangi, B McCabe, AP Schoelligb
Proceedings of the ISARC. International Symposium on Automation and Robotics …, 2019
242019
Automatic realignment of defective assemblies using an inverse kinematics analogy
M Nahangi, CT Haas, J West, S Walbridge
Journal of Computing in Civil Engineering 30 (2), 04015008, 2016
242016
Pipe radius estimation using Kinect range cameras
M Nahangi, T Czerniawski, CT Haas, S Walbridge
Automation in construction 99, 197-205, 2019
222019
Parallel systems and structural frames realignment planning and actuation strategy
M Nahangi, T Czerniawski, CT Haas, S Walbridge, J West
Journal of Computing in Civil Engineering 30 (4), 04015067, 2016
212016
Системата не може да изпълни операцията сега. Опитайте отново по-късно.
Статии 1–20