A branch-and-bound method for solving multi-skill project scheduling problem O Bellenguez-Morineau, E Néron
RAIRO-operations Research 41 (2), 155-170, 2007
184 2007 Lower bounds for the multi-skill project scheduling problem with hierarchical levels of skills O Bellenguez, E Néron
International conference on the practice and theory of automated timetabling …, 2004
177 2004 Branch-and-price approach for the multi-skill project scheduling problem C Montoya, O Bellenguez-Morineau, E Pinson, D Rivreau
Optimization Letters 8, 1721-1734, 2014
68 2014 Methods to solve multi-skill project scheduling problem O Bellenguez-Morineau
4OR 6 (1), 85-88, 2008
63 2008 A constraint-based approach for the shift design personnel task scheduling problem with equity T Lapègue, O Bellenguez-Morineau, D Prot
Computers & Operations Research 40 (10), 2450-2465, 2013
49 2013 A survey on how the structure of precedence constraints may change the complexity class of scheduling problems D Prot, O Bellenguez-Morineau
Journal of Scheduling 21 (1), 3-16, 2018
40 2018 A two-phase method for the Shift Design and Personnel Task Scheduling Problem with Equity objective D Prot, T Lapègue, O Bellenguez-Morineau
International Journal of Production Research, 2015
32 2015 New complexity results for parallel identical machine scheduling problems with preemption, release dates and regular criteria D Prot, O Bellenguez-Morineau, C Lahlou
European Journal of Operational Research 231 (2), 282-287, 2013
28 2013 Methods for solving the multi-skill project scheduling problem O Bellenguez, E Néron
Proceedings of the ninth international workshop on project management and …, 2004
27 2004 Multi‐Mode and Multi‐Skill Project Scheduling Problem O Bellenguez‐Morineau, E Néron
Resource‐Constrained Project Scheduling: Models, Algorithms, Extensions and …, 2008
21 2008 Multi-skill project scheduling problem and total productive maintenance C Pessan, O Bellenguez-Morineau, E Néron
Proceedings of MISTA, 608-610, 2007
18 2007 Integrated column generation and lagrangian relaxation approach for the multi-skill project scheduling problem C Montoya, O Bellenguez-Morineau, E Pinson, D Rivreau
Handbook on Project Management and Scheduling Vol. 1, 565-586, 2015
15 2015 Tabu search and lower bound for an industrial complex shop scheduling problem D Prot, O Bellenguez-Morineau
Computers & Industrial Engineering 62 (4), 1109-1118, 2012
15 2012 Clustering-based solution approach for a capacitated lot-sizing problem on parallel machines with sequence-dependent setups F Larroche, O Bellenguez, G Massonnet
International Journal of Production Research 60 (21), 6573-6596, 2022
13 2022 A tabu search procedure for multi-skill project scheduling problem O Bellenguez-Morineau, E Neron
Journal of Operations and Logistics, -, 2014
12 2014 Méthodes de résolution pour un problème de gestion de projet multi-compétence O Bellenguez-Morineau
Tours, 2006
11 2006 A tour scheduling problem with fixed jobs: use of constraint programming T Lapègue, D Prot, O Bellenguez-Morineau
PATAT 2012, 94, 2012
10 2012 A reactive approach for the multi-skill Project Scheduling Problem O Bellenguez-Morineau
7th international conference on the Practice And Theory of Automated …, 2008
8 2008 A note on -hardness of preemptive mean flow-time scheduling for parallel machines O Bellenguez-Morineau, M Chrobak, C Dürr, D Prot
Journal of Scheduling 18, 299-304, 2015
7 2015 Optimisation de la planification de bourses d’échanges de technologies C Guéret, O Bellenguez-Morineau, C Pavageau, O Péton, D Poncelet
ROADEF 9, 177-178, 2009
7 2009