Следене
Asri Nurdiana
Asri Nurdiana
Civil Engineering, Diponegoro University
Потвърден имейл адрес: live.undip.ac.id
Заглавие
Позовавания
Позовавания
Година
Analisis biaya tidak langsung pada proyek pembangunan best western star hotel & star apartement semarang
A Nurdiana
Teknik 36 (2), 105-109, 2015
262015
Sensitivity analysis of risk from stakeholders’ perception Case study: Semarang-Solo highway project section I (Tembalang-Gedawang)
A Nurdiana, MA Wibowo, JUD Hatmoko
Procedia Engineering 125, 12-17, 2015
232015
Identification of potential uses of building information modeling (BIM) for construction supply chain management: preliminary studies
MN Sholeh, A Nurdiana, B Setiabudi
IOP Conference Series: Earth and Environmental Science 448 (1), 012064, 2020
17*2020
Aplikasi Manajemen Resiko Dari Persepsi Para Stakeholders (Studi Kasus Proyek Pembangunan Jalan Tol Semarang-Solo Seksi I Ruas Tembalang-Gedawang)
A Nurdiana, MA Wibowo, DH Utomo
magister teknik sipil, 2011
152011
Cost overrun in construction projects in Indonesia
R Susanti, A Nurdiana
IOP Conference Series: Earth and Environmental Science 506 (1), 012039, 2020
142020
The identification of waste construction at construction project life cycle
MA Wibowo, NU Handayani, A Nurdiana, MN Sholeh
Advanced Science Letters 23 (3), 2633-2635, 2017
142017
Implementation of construction supply chain flow based on SCOR 12.0 performance standards
MN Sholeh, A Nurdiana, B Dharmo
Journal of Physics: Conference Series 1833 (1), 012012, 2021
132021
Assessing risk on the engineering procurement construction (EPC) project from the perspective of the owner: a case study
A Nurdiana, R Susanti
IOP Conference Series: Earth and Environmental Science 506 (1), 012040, 2020
112020
Developing indicators of green initiation and green design of green supply chain management in construction industry
MA Wibowo, NU Handayani, N Farida, A Nurdiana
E3S Web of Conferences 115, 02006, 2019
112019
Determining factors for implementing green supply chain management in the construction industry: a literature review
MA Wibowo, NU Handayani, A Mustikasari, A Nurdiana, MN Soleh
MATEC Web of Conferences 159, 01022, 2018
92018
Risk management in Indonesia construction project: A case study of a toll road project
MA Wibowo, JUD Hatmoko, A Nurdiana
Risk Management Treatise for Engineering Practitioners, 2018
72018
Mapping of information and identification of construction waste at project life cycle
MA Wibowo, NU Handayani, A Nurdiana, MN Sholeh, GS Pamungkas
AIP Conference Proceedings 1941 (1), 2018
72018
An analysis of antioxidants, organoleptics and hedonics with variations of boiling time in Jasmine tea and Jasmine root tea a study on Kaliprau, Pemalang
F Arifan, S Winarni, G Handoyo, A Nurdiana, S Risdiyanti
Journal of Physics: Conference Series 1025 (1), 012066, 2018
62018
Hexalock Brick: Inovasi Batako Pendukung Konsep Pre-Febricate Building Yang Ringan, Ekonomis Dan Ramah Lingkungan
SA Nugroho, MD Fadilah, TB Ginting, A Nurdiana
Jurnal Proyek Teknik Sipil 2 (1), 25-30, 2019
52019
What causes cost overrun in highway strategic project in Indonesia?
R Susanti, A Nurdiana, YF Kurnianto
IOP Conference Series: Earth and Environmental Science 700 (1), 012050, 2021
42021
Pendampingan inventarisasi faktor penyebab banjir dan rob di DAS Kendal Kabupaten Kendal
A Nurdiana, S Fauziyah, S Sutanto
Jurnal Pengabdian Vokasi 1 (4), 290-293, 2020
42020
Risk study on supply chain management in construction (Case study: Building projects in Indonesia)
A Nurdiana, MN Sholeh
IOP Conference Series: Materials Science and Engineering 669 (1), 012042, 2019
42019
Risk management application at performance based contracts based on project life cycle using AHP method (case study at road maintenance project in Indonesia)
A Nurdiana, MA Wibowo
Advanced Science Letters 24 (12), 9537-9539, 2018
42018
Aplikasi manajemen risiko pada proyek jalan tol Semarang-Solo Ruas Bawen-Solo
A Nurdiana, B Setiabudi
Jurnal Proyek Teknik Sipil 1 (1), 21-28, 2018
42018
Perencanaan Jembatan Mlulon Dengan Box Culvert
A Nurdiana
Jurnal Proyek Teknik Sipil 4 (1), 24-32, 2021
32021
Системата не може да изпълни операцията сега. Опитайте отново по-късно.
Статии 1–20